NURION
About NURION

Off-grid power that arrives with the specification, document pack and field plan aligned.

Across the Middle East, the line between a working clinic and a failed one, a functional tent and an abandoned one, a livable home and one that cannot survive the summer — increasingly comes down to electricity. We supply field-ready solar power infrastructure for projects where chemistry, heat, documents and handover matter as much as watt-hours.

You may be worried about these problems

Heat, dust, air-freight rules, tender documents and field repair are the real risks. A weekend power station can look good in a brochure and still fail a clinic, camp or government project.

What you can check before approval

Battery chemistry, operating temperature, IP rating, UN38.3, repairable parts, document pack and shipment plan are confirmed before project release — not after the equipment is already in transit.

One project support line

Engineering is in Shenzhen, regional support is in Dubai, and project distributors keep the field conversation local. Hardware does not require a cloud account to switch on.

Phase 01

Plan

  1. 01Use case brief
  2. 02Load estimate
  3. 03Spec match

Phase 02

Approve

  1. 04Sample unit
  2. 05Document pack
  3. 06Project quote

Phase 03

Deploy

  1. 07QC release
  2. 08Freight plan
  3. 09Field handover
Our brief

Built for projects, not for weekends.

Most portable power equipment available worldwide is engineered for North American weekend campers. Pretty colour displays, Nickel-Manganese-Cobalt (NMC) battery chemistry, and a declared operating ceiling of +40 °C. None of that is appropriate for an Iraqi summer, a refugee airdrop, or a paediatric incubator.

We engineer to a different brief. Lithium Iron Phosphate (LFP) chemistry that does not thermal-runaway near patients. Validated continuous discharge to +55 °C. IP65/IP66 lighting for dust storms. UN38.3 air-transport clearance for humanitarian air-freight. And a deliberately repairable construction so the housing outlives the cell pack.

Designed in Shenzhen, supported by a regional liaison in Dubai, supplied to project distributors, ministries of health, UN agencies and resilience-procurement programmes across the Gulf, the Levant, North Africa and beyond.

A field engineer wiring an unbranded portable power station to a folded solar panel
Operating principles

Six release standards before project shipment.

LFP-only chemistry

We will not ship NMC for portable power-station product, even when it is cheaper. The thermal-runaway profile is not appropriate for indoor humanitarian or healthcare deployment.

+55 °C validated, not labelled

Operating ceilings are validated through 30-day continuous-discharge test campaigns at the declared envelope — not transcribed from the cell-supplier datasheet.

Repairable by design

Cell modules, LED arrays and DC motors are line-replaceable items. The housing is rated for 8–10 years; the cell pack is replaced once over that lifetime.

Documentation to procurement standard

Every shipment ships with TDS, SDS, certificate-of-conformity, batch QC report and (for ≥ 50-unit project orders) third-party test report bundle.

No software lock-in, no app subscription

We will not ship a power station that requires a cloud account to function. Field operators in Yemen do not have reliable mobile data; humanitarian programmes do not accept SaaS-locked equipment.

Honest pricing per project tier

Humanitarian-allocation pricing for accredited NGOs and ministries of health is published in writing, not negotiated case-by-case. Distribution pricing is by territory contract, not first-quote.

Compliance & certification

Cleared for sovereign and humanitarian procurement.

Quality & compliance
IEC 62133-2 Battery SafetyIEC 61215 PV ModuleCE ConformityRoHS CompliantISO 9001 QualityUN38.3 Air Transport

Start a project

Talk to the NURION project desk.

A project engineer will reply within one business day with a deliverable specification and shipping plan.